| Course Structure |
Hrs/Wk |
Credit |
| Year 2 |
|
|
| 305712 |
v.1 |
|
WASM Project Stream Mining Geomechanics |
|
75.0 |
| |
|
|
OR |
|
|
| 305713 |
v.1 |
|
WASM Dissertation Stream Mining Geomechanics |
|
75.0 |
| |
|
|
SELECT OPTIONAL UNITS TO THE TOTAL VALUE OF: |
|
25.0 |
| |
100.0 |
| |
| Optional Units to Select From in Year 0 Not entered |
Hrs/Wk |
Credits |
| 10750 |
v.5 |
|
WASM Rockmass Characterisation 601 |
25.0 |
12.5 |
| 10751 |
v.5 |
|
WASM Blast Engineering 603 |
25.0 |
12.5 |
| 10752 |
v.4 |
|
WASM Environmental Geomechanics 604 |
24.0 |
12.5 |
| 10753 |
v.5 |
|
WASM Engineering Rock Mechanics 601 |
25.0 |
12.5 |
| 10754 |
v.5 |
|
WASM Geological Engineering 601 |
25.0 |
12.5 |
| 10756 |
v.5 |
|
WASM Geomechanics Project Management 604 |
25.0 |
12.5 |
| 10757 |
v.4 |
|
WASM Minewater Engineering 602 |
25.0 |
12.5 |
| 10758 |
v.4 |
|
WASM Numerical Modelling 602 |
25.0 |
12.5 |
| 10759 |
v.4 |
|
WASM Numerical Modelling 603 |
25.0 |
12.5 |
| 10760 |
v.5 |
|
WASM Mine Seismicity 603 |
25.0 |
12.5 |
| 10761 |
v.4 |
|
WASM Underground Rock Engineering 604 |
24.0 |
12.5 |
| 10762 |
v.5 |
|
WASM Rock Support and Reinforcement 603 |
25.0 |
12.5 |
| 10763 |
v.5 |
|
WASM Rock Slope Engineering 602 |
25.0 |
12.5 |
| 10764 |
v.5 |
|
WASM Rock Testing and Instrumentation 602 |
25.0 |
12.5 |
| 11906 |
v.2 |
|
WASM Probability and Risk in Geomechanics 604 |
25.0 |
12.5 |
| 11907 |
v.3 |
|
WASM Stress Analysis 601 |
25.0 |
12.5 |
| 11908 |
v.3 |
|
WASM Mine Backfill 603 |
25.0 |
12.5 |
| |
|
|
|
|
|
| |
|
|
|
|
|
The information displayed above refers to study periods and locations that students are eligible to be offe red and admitted to this course for the first time only.