Area: | Department of Petroleum Engineering |
Credits: | 25.0 |
Contact Hours: | 40.0 |
Lecture: | 1 x 20 Hours 4 Weekly |
Tutorial: | 1 x 20 Hours 4 Weekly |
Prerequisite(s): | 308071 (v.1) Production Technology 606 or any previous version
|
Syllabus: | Drilling operations for ERD, horizontal, multi lateral wells. HPHT drilling, deep water drilling and well control, coiled tubing drilling and under balanced drilling and novel percussion or hard rock drilling. |
|
Unit Outcomes: | Knowledge for drilling horizontal and multilateral wells and the use of coiled tubing as a drilling tool. |
Texts and references listed below are for your information only and current as of September 30, 2003. Some units taught offshore are modified at selected locations. Please check with the unit coordinator for up-to-date information and approved offshore variations to unit information before finalising study and textbook purchases. |
Unit References: | Sada D. Jobhi., (1991), Horizontal Well Technology, PennWell Publishing Company. Lyons, C. William.,( 2001), Air and Gas Drilling Manual, McGraw-Hill. |
Unit Texts: | Course Notes. |
|
Unit Assessment Breakdown: | Final Exam 70%, Tutorials/Projects 30%. This is a Grade/Mark assessment. |
Field of Education: |  10700 Earth Sciences (Narrow Grouping) | HECS Band (if applicable): | 2   |
|
Extent to which this unit or thesis utilises online information: |  Informational   | Result Type: |  Grade/Mark |
|
AvailabilityAvailability Information has not been provided by the respective School or Area. Prospective students should contact the School or Area listed above for further information.
|