4783 (v.4) WASM Process Design 562
Area: | WASM Minerals Engineering and Extractive Metallurgy Teaching Area |
Credits: | 25.0 |
Contact Hours: | 5.0 |
Lecture: | 1 x 5 Hours Weekly |
Prerequisite(s): | 5633 (v.5) WASM Mineral Processing 561 or any previous version
OR
5631 (v.6) WASM Pyrometallurgy 561 or any previous version
|
Co Requisite(s): | 5632 (v.6) WASM Pyrometallurgy 562
AND
5634 (v.5) WASM Mineral Processing 562
AND
5640 (v.7) WASM Hydrometallurgy 562
|
Syllabus: | Metallurgical flowsheets - geological, mineralogical, mining, process technology, economics, safety, location. Students choose an ore or mineral and develop a flowsheet based on various data. A final report and flowsheet are produced to assess the students grasp and understanding of the design procedures. |
  |
Unit Outcomes: | On successful completion of this unit, students will have- Understood the basic concepts of plant design. |
Text and references listed above are for your information only and current as of September 30, 2003. Please check with the unit coordinator for up-to-date information. |
Unit References: | Halbe, D., (1993), Process Design Notes and Study Guide, WASM. Mular and Bhappu, Eds, (1980), Mineral Processing Plant Design AIME. Charlesworth, K and Davey, R., (1995), METSIM Process Simulator Workbook. Cost Estimation Handbook for the Australian Mining Industry, (1993) Aus IMM. |
Unit Texts: | Halbe, D., (1993), Process Design Notes and Study Guide, WASM. Mular and Bhappu, Eds, (1980), Mineral Processing Plant Design AIME. Charlesworth, K and Davey, R., (1995), METSIM Process Simulator Workbook. Cost Estimation Handbook for the Australian Mining Industry, (1993) Aus IMM. |
  |
Unit Assessment Breakdown: | Final Report 100%. This is by Grade/Mark Assessment. |
Year | Location | Period | Internal | Area External | Central External | 2004 | Kalgoorlie Campus | Semester 2 | Y | Y | | |
Current as of: February 2, 2004
CRICOS provider code 00301J