301739 (v.3) Production Technology 607
Area: | Department of Petroleum Engineering |
Contact Hours: | 10.0 |
Credits: | 25.0 |
Lecture: | 1 x 20 Hours |
Tutorial: | 1 x 20 Hours |
Prerequisite(s): | 301734 (v.3) Drilling Engineering 603 or any previous version
|
Tubing design and selection, well intervention and workover techniques, completion fluids, perforating, completion equipment, production logging, artificial lift, sand stabilisation and exclusion, production optimisation, well flow performance evaluation, water and gas control, stimulation, new technology, surface production facilities and operation. |
Click here for a printable version of this page