301739 (v.3) Production Technology 607



 

Area:Department of Petroleum Engineering
Contact Hours:10.0
Credits:25.0
Lecture:1 x 20 Hours
Tutorial:1 x 20 Hours
Prerequisite(s):301734 (v.3) Drilling Engineering 603 or any previous version
Tubing design and selection, well intervention and workover techniques, completion fluids, perforating, completion equipment, production logging, artificial lift, sand stabilisation and exclusion, production optimisation, well flow performance evaluation, water and gas control, stimulation, new technology, surface production facilities and operation.

 

 

Copyright and Disclaimer
Current as of: February 20, 2003     5:01:33
CRICOS provider code 00301J