Courses Handbook 2007 - [ Archived ]

301739 (v.3) Production Technology 607


Area:

Department of Petroleum Engineering

Credits:

25.0

Contact Hours:

40.0
 
** The tuition pattern below provides details of the types of classes and their duration. This is to be used as a guide only. For more precise information please check your unit outline. **
 

Lecture:

1 x 20 Hours 4 Weekly

Tutorial:

1 x 20 Hours 4 Weekly

Prerequisite(s):

301734 (v.3) Drilling Engineering 603 or any previous version
 

Syllabus:

Tubing design and selection, well intervention and workover techniques, completion fluids, perforating, completion equipment, production logging, artificial lift, sand stabilisation and exclusion, production optimisation, well flow performance evaluation, water and gas control, stimulation, new technology, surface production facilities and operation.
 
** To ensure that the most up-to-date information about unit references, texts and outcomes appears, they will be provided in your unit outline prior to commencement. **
 

Field of Education:

030100 Manufacturing Engineering and Technology (Narrow Grouping)

Funding Cluster:

08 - Engineering, Science, Surveying

SOLT (Online) Definitions*:

Informational
*Extent to which this unit or thesis utilises online information

Result Type:

Grade/Mark

Availability

Availability Information has not been provided by the respective School or Area. Prospective students should contact the School or Area listed above for further information.

 
Curtin Search Curtin Site Index