312157 (v.1) Stimulation and Intervention Operations 406
Note
Tutition Patterns
The tuition pattern below provides details of the types of classes and their duration. This is to be used as a guide only. For more precise information please check your unit outline.
Unit references, texts and outcomes
To ensure that the most up-to-date information about unit references, texts and outcomes appears, they will be provided in your unit outline prior to commencement.
Area: | Department of Petroleum Engineering |
---|---|
Credits: | 25.0 |
Contact Hours: | 3.5 |
Lecture: | 1 x 2 Hours Weekly |
Tutorial: | 1 x 1.5 Hours Weekly |
Syllabus: | Introduction to well problems, Well intervention operations, Formation damage, Sand control, Water control, Acidisation, Hydraulic fracturing, Scale deposition, removal and prevention, Corrosion control. |
Field of Education: | 030399 Process and Resources Engineering not elsewhere classified |
SOLT (Online) Definitions*: | Informational *Extent to which this unit or thesis utilises online information |
Result Type: | Grade/Mark |
Availability
Availability Information has not been provided by the respective School or Area. Prospective students should contact the School or Area listed above for further information.