310552 (v.1) Plant Shutdown, Commissioning and Cathodic Protection 100
Note
Tutition Patterns
The tuition pattern below provides details of the types of classes and their duration. This is to be used as a guide only. For more precise information please check your unit outline.
Unit references, texts and outcomes
To ensure that the most up-to-date information about unit references, texts and outcomes appears, they will be provided in your unit outline prior to commencement.
Area: | Curtin Sarawak |
---|---|
Credits: | 12.5 |
Contact Hours: | 8.0 |
Other: | 4 x 2 Hours Weekly |
Syllabus: | Plant shutdown: identify maintenance project and plant requirements; identify tasks, timelines and resources; develop a schedule; communicate with all relevant stakeholders and monitor shutdown. Monitor and maintain cathodic protection systems: prepareand organise operational and maintenance activities; monitor and adjust electrical equipment; conduct CP system surveys; recommission the system; analyse and utilise CP data; control hazards and respond to problems. Commission/recommission plant: contribute to the design of plant/equipment; take part in commission planning; participate in acceptance of plant equipment; commission system, evaluate results and identify modifications. Decommission plant: contribute to decommission planning; isolate and decontaminate equipment/units and inspect, test and notify completion of work. |
Field of Education: | 030399 Process and Resources Engineering not elsewhere classified |
SOLT (Online) Definitions*: | Not Online *Extent to which this unit or thesis utilises online information |
Result Type: | Grade/Mark |
Availability
Availability Information has not been provided by the respective School or Area. Prospective students should contact the School or Area listed above for further information.