308071 (v.1) Production Technology 606
Note
Tutition Patterns
The tuition pattern below provides details of the types of classes and their duration. This is to be used as a guide only. For more precise information please check your unit outline.
Unit references, texts and outcomes
To ensure that the most up-to-date information about unit references, texts and outcomes appears, they will be provided in your unit outline prior to commencement.
Area: | Department of Petroleum Engineering |
---|---|
Credits: | 25.0 |
Contact Hours: | 40.0 |
Lecture: | 1 x 20 Hours 4 Weekly |
Tutorial: | 1 x 20 Hours 4 Weekly |
Prerequisite(s): |
308070 (v.1)
Reservoir Engineering for Drilling Engineers 605
or any previous version
|
Syllabus: | Tubing design and selection, well intervention and workover techniques, completion fluids, perforating, completion equipment, production logging, artificial lift, sand stabilisation and exclusion, production optimisation, well flow performance evaluation, water and gas control, stimulation, new technology, surface production facilities and operation. |
Field of Education: | 010700 Earth Sciences (Narrow Grouping) |
SOLT (Online) Definitions*: | Informational *Extent to which this unit or thesis utilises online information |
Result Type: | Grade/Mark |
Availability
Availability Information has not been provided by the respective School or Area. Prospective students should contact the School or Area listed above for further information.