310552 (v.1) Plant Shutdown, Commissioning and Cathodic Protection 100
| Area: | Curtin Sarawak |
|---|---|
| Credits: | 12.5 |
| Contact Hours: | 8.0 |
| Tuition Patterns: | The tuition pattern provides details of the types of classes and their duration. This is to be used as a guide only. Precise information is included in the unit outline. |
| Other: | 4 x 2 Hours Weekly |
| Syllabus: | Plant shutdown: identify maintenance project and plant requirements; identify tasks, timelines and resources; develop a schedule; communicate with all relevant stakeholders and monitor shutdown. Monitor and maintain cathodic protection systems: prepareand organise operational and maintenance activities; monitor and adjust electrical equipment; conduct CP system surveys; recommission the system; analyse and utilise CP data; control hazards and respond to problems. Commission/recommission plant: contribute to the design of plant/equipment; take part in commission planning; participate in acceptance of plant equipment; commission system, evaluate results and identify modifications. Decommission plant: contribute to decommission planning; isolate and decontaminate equipment/units and inspect, test and notify completion of work. |
| Unit references, texts, outcomes and assessment details | The most up-to-date information about unit references, texts and outcomes, will be provided in the unit outline. |
| Field of Education: | 030399 Process and Resources Engineering not elsewhere classified |
| Result Type: | Grade/Mark |
Availability
Availability Information has not been provided by the respective School or Area. Prospective students should contact the School or Area listed above for further information.