Area: |
Department of Petroleum Engineering | ||||||||||||||||||||||||
Credits: |
50.0 | ||||||||||||||||||||||||
Contact Hours: |
30.0 | ||||||||||||||||||||||||
** The tuition pattern below provides details of the types of classes and their duration. This is to be used as a guide only. For more precise information please check your unit outline. ** | |||||||||||||||||||||||||
Lecture: |
1 x 5 Hours 4 Weekly | ||||||||||||||||||||||||
Other: |
1 x 20 Hours 4 Weekly | ||||||||||||||||||||||||
Tutorial: |
1 x 5 Hours 4 Weekly | ||||||||||||||||||||||||
Prerequisite(s): |
308068 (v.1) Drilling Engineering Fundamentals 603 or any previous version AND 308069 (v.1) Advanced Drilling Practices 604 or any previous version AND 308072 (v.1) Advanced Drilling Techniques 608 or any previous version |
||||||||||||||||||||||||
Syllabus: |
Drilling programming. cost estimation and budgets. Well site supervision. Abandonment. Drilling contracts, performance and performance measures. Incentivisation. Well design project covering areas of well planning to provide optimum production and injection performance, the optimum well design to reach the specified target location ensuring safety, maximum integrity and reliability at minimal costs. Selection of optimum well trajectories, equipment selection, drilling, completion and workover planning and scheduling, rig selection and cost estimate. | ||||||||||||||||||||||||
** To ensure that the most up-to-date information about unit references, texts and outcomes appears, they will be provided in your unit outline prior to commencement. ** | |||||||||||||||||||||||||
Field of Education: | 030100 Manufacturing Engineering and Technology (Narrow Grouping) | ||||||||||||||||||||||||
Funding Cluster: | 08 - Engineering, Science, Surveying | ||||||||||||||||||||||||
SOLT (Online) Definitions*: | Informational *Extent to which this unit or thesis utilises online information | ||||||||||||||||||||||||
Result Type: | Grade/Mark | ||||||||||||||||||||||||
Availability |
|||||||||||||||||||||||||
|