|
307677 (v.1) PEng 424 Production Technology
Area: |
Department of Petroleum Engineering |
Credits: |
25.0 |
Contact Hours: |
5.0 |
|
** The tuition pattern below provides details of the types of classes and their duration. This is to be used as a guide only. For more precise information please check your unit outline. ** |
|
|
Syllabus: |
Well completion design, well flow performance concepts, tubing design and selection, well intervention and workover techniques, completion fluids, perforating, completion equipment, production logging, artificial lift, sand stabilisation and exclusion, production optimisation, well flow performance evaluation, stimulation, new technology, surface production facilities and operation. For tuition pattern details and contact hours, please contact the Department of Petroleum Engineering. |
|
** To ensure that the most up-to-date information about unit references, texts and outcomes appears, they will be provided in your unit outline prior to commencement. ** |
|
Field of Education: | 039900 Other Engineering and Related Technologies (Narrow Grouping) | Funding Cluster: | 08 - Engineering, Science, Surveying | SOLT (Online) Definitions*: | Informational *Extent to which this unit or thesis utilises online information | Result Type: | Grade/Mark |
Availability |
Availability Information has not been provided by the respective School or Area. Prospective students should contact the School or Area listed above for further information. |
| |