308075 (v.1) Remedial, Stimulation and Intervention Operations
Area: | Department of Petroleum Engineering |
Contact Hours: | 40.0 |
Credits: | 25.0 |
Lecture: | 1 x 20 Hours 4 Weekly |
Tutorial: | 1 x 20 Hours 4 Weekly |
Prerequisite(s): | 308068 (v.1) Drilling Engineering 603
AND
308069 (v.1) Advanced Drilling Practices 604
|
Production logging, well diagnosis, sand exclusion and sand management, matrix acidising and acid fracturing, hydraulic fracturing, other chemical treatments, coiled tubing, snubbing, workover planning, intervention operations, intervention well control,workover economics and risk. |
Current as of: October 30, 2003 13:11:55
CRICOS provider code 00301J