304461 (v.2) Drilling Engineering 703



 

Area:Department of Petroleum Engineering
Contact Hours:160.0
Credits:25.0
Lecture:1 x 20 Hours 4 Weekly
Tutorial:1 x 20 Hours 4 Weekly
Role of drilling in petroleum development, drilling rig selection, pore pressure determination, drill string selection and design, drilling fluids and bits, drilling mud hydraulics and lifting capacity, aspects of well control, vertical, deviated, horizontal and multilateral wells, pressure losses, surge and swab pressure, rock mechanics in wellbore construction, wellbore stability, corrosion control, cementing and cement bond evaluation, casing and tubular design and selection, and riser design for deepwater.
YearLocationPeriodInternalArea ExternalCentral External
2003Bentley CampusShort Period 7Y  

 

Copyright and Disclaimer
Current as of: October 30, 2003     13:11:55
CRICOS provider code 00301J