Courses Handbook 2007 - [ Archived ]

308072 (v.1) Advanced Drilling Techniques 608


Area:

Department of Petroleum Engineering

Credits:

25.0

Contact Hours:

40.0
 
** The tuition pattern below provides details of the types of classes and their duration. This is to be used as a guide only. For more precise information please check your unit outline. **
 

Lecture:

1 x 20 Hours 4 Weekly

Tutorial:

1 x 20 Hours 4 Weekly

Prerequisite(s):

308071 (v.1) Production Technology 606 or any previous version
 

Syllabus:

Drilling operations for Extended Reach Drilling (ERD), horizontal, multilateral wells. High Pressure High Temperature (HPHT) drilling, deep water drilling and well control, coiled tubing drilling and under balanced drilling and novel percussion or hard rock drilling.
 
** To ensure that the most up-to-date information about unit references, texts and outcomes appears, they will be provided in your unit outline prior to commencement. **
 

Field of Education:

010700 Earth Sciences (Narrow Grouping)

Funding Cluster:

08 - Engineering, Science, Surveying

SOLT (Online) Definitions*:

Informational
*Extent to which this unit or thesis utilises online information

Result Type:

Grade/Mark

Availability

Availability Information has not been provided by the respective School or Area. Prospective students should contact the School or Area listed above for further information.

 
Curtin Search Curtin Site Index