Courses Handbook 2007 - [ Archived ]

303155 (v.1) WASM Surface Mine Design 332


Area:

WASM Mining Engineering Teaching Area

Credits:

25.0

Contact Hours:

5.0
 
** The tuition pattern below provides details of the types of classes and their duration. This is to be used as a guide only. For more precise information please check your unit outline. **
 

Lecture:

1 x 2 Hours Weekly

Laboratory:

1 x 3 Hours Weekly

Prerequisite(s):

303152 (v.1) WASM Surface Mining 331
 

Syllabus:

Review of mine planning and design packages. Review of open pit mine design principles and practice. Pit slope design. Cost estimation in practice. Pit shell optimisation in practice. Pit and haul ramp design. In-pit grade and tonnage calculations. Development and production scheduling. Waste dump location and design. Financial analysis. Occupational health and safety issues in surface mine design.
 
** To ensure that the most up-to-date information about unit references, texts and outcomes appears, they will be provided in your unit outline prior to commencement. **
 

Field of Education:

030303 Mining Engineering

Funding Cluster:

08 - Engineering, Science, Surveying

SOLT (Online) Definitions*:

Informational
*Extent to which this unit or thesis utilises online information

Result Type:

Grade/Mark

Availability

Availability Information has not been provided by the respective School or Area. Prospective students should contact the School or Area listed above for further information.

 
Curtin Search Curtin Site Index