Area: |
WASM Mining Engineering Teaching Area |
Credits: |
25.0 |
Contact Hours: |
5.0 |
** The tuition pattern below provides details of the types of classes and their duration. This is to be used as a guide only. For more precise information please check your unit outline. ** | |
Lecture: |
1 x 2 Hours Weekly |
Laboratory: |
1 x 3 Hours Weekly |
Prerequisite(s): |
303152 (v.1) WASM Surface Mining 331 |
Syllabus: |
Review of mine planning and design packages. Review of open pit mine design principles and practice. Pit slope design. Cost estimation in practice. Pit shell optimisation in practice. Pit and haul ramp design. In-pit grade and tonnage calculations. Development and production scheduling. Waste dump location and design. Financial analysis. Occupational health and safety issues in surface mine design. |
** To ensure that the most up-to-date information about unit references, texts and outcomes appears, they will be provided in your unit outline prior to commencement. ** | |
Field of Education: | 030303 Mining Engineering |
Funding Cluster: | 08 - Engineering, Science, Surveying |
SOLT (Online) Definitions*: | Informational *Extent to which this unit or thesis utilises online information |
Result Type: | Grade/Mark |
Availability |
|
Availability Information has not been provided by the respective School or Area. Prospective students should contact the School or Area listed above for further information. |