Area: |
Department of Petroleum Engineering |
Credits: |
25.0 |
Contact Hours: |
40.0 |
|
** The tuition pattern below provides details of the types of classes and their duration. This is to be used as a guide only. For more precise information please check your unit outline. ** |
|
Lecture: |
1 x 20 Hours 4 Weekly |
Tutorial: |
1 x 20 Hours 4 Weekly |
Prerequisite(s): |
308068 (v.1) Drilling Engineering Fundamentals 603
AND
308069 (v.1) Advanced Drilling Practices 604
|
|
Syllabus: |
Production logging, well diagnosis, sand exclusion and sand management, matrix acidising and acid fracturing, hydraulic fracturing, other chemical treatments, coiled tubing, snubbing, workover planning, intervention operations, intervention well control,workover economics and risk. |
|
** To ensure that the most up-to-date information about unit references, texts and outcomes appears, they will be provided in your unit outline prior to commencement. ** |
|
Field of Education: |
10700 Earth Sciences (Narrow Grouping) |
HECS Band (if applicable): |
2 |
|
Extent to which this unit or thesis utilises online information: |
Informational |
Result Type: |
Grade/Mark |
|
Availability |
Availability Information has not been provided by the respective School or Area. Prospective students should contact the School or Area listed above for further information. |