301734 (v.3) Drilling Engineering 603
Note
Tutition Patterns
The tuition pattern below provides details of the types of classes and their duration. This is to be used as a guide only. For more precise information please check your unit outline.
Unit references, texts and outcomes
To ensure that the most up-to-date information about unit references, texts and outcomes appears, they will be provided in your unit outline prior to commencement.
Area: | Department of Petroleum Engineering |
---|---|
Credits: | 25.0 |
Contact Hours: | 5.0 |
Lecture: | 1 x 3 Hours Weekly |
Tutorial: | 1 x 2 Hours Weekly |
Syllabus: | Role of drilling in petroleum development; drilling rig selection; pore pressure determination; drill string selection and design; drilling fluids and bits; drilling mud hydraulics and lifting capacity; aspects of well control; vertical, deviated, horizontal and multilateral wells; pressure losses; surge and swab pressure; rock mechanics in wellbore construction; wellbore stability; corrosion control; cementing and cement bond evaluation; casing and tubular design and selection; and riser design for deep water. |
Field of Education: | 030100 Manufacturing Engineering and Technology (Narrow Grouping) |
SOLT (Online) Definitions*: | Informational *Extent to which this unit or thesis utilises online information |
Result Type: | Grade/Mark |
Availability
Availability Information has not been provided by the respective School or Area. Prospective students should contact the School or Area listed above for further information.