304468 (v.2) Production Technology 707
Area: | Department of Petroleum Engineering |
Contact Hours: | 10.0 |
Credits: | 25.0 |
Lecture: | 1 x 20 Hours |
Tutorial: | 1 x 20 Hours |
Tubing design and selection, well intervention and workover techniques, completion fluids, perforating, completion equipment, production logging, artificial lift, sand stabilisation and exclusion, production optimisation, well flow performance evaluation, water and gas control, stimulation, new technology, surface production facilities and operation. |
Click here for a printable version of this page