| |
301734 (v.3) Drilling Engineering 603
Area: | Department of Petroleum Engineering |
Contact Hours: | 10.0 |
Credits: | 25.0 |
Role of drilling in petroleum development, drilling rig selection, pore pressure determination, drill string selection and design, drilling fluids and bits, drilling mud hydraulics and lifting capacity, aspects of well control, vertical, deviated, horizontal and multilateral wells, pressure losses, surge and swab pressure, rock mechanics in wellbore construction, wellbore stability, corrosion control, cementing and cement bond evaluation, casing and tubular design and selection, and riser design for deepwater. |
Availability
Year | Location | Period | Internal | Area External | Central External | 2003 | Bentley Campus | Short Period 7 | Y | | |
- Area External refers to external course/units run by the School or Department, offered online or through Web CT, or offered by research. - Central External refers to external course/units run through the Curtin Bentley-based Distance Education Area. |
Click here for a printable version of this page
|
|
|
|