Link to Curtin homepage      CurtinSearch | Curtin Site Index 
Online handbook 2004
Courses Units Research Courses New Courses Joint-Uni Courses Definition of Terms Contact / Help
About Curtin University
Academic calendar
Admissions Information
Applying for a research higher degree
Applying to Curtin
Bookshop
Prospective Student Services
Curtin scholarships
Enrolment information
Fee Information
Grading system
IT Policy
Student rights and responsibilities
Student policy and procedures
    

308075 (v.1) Remedial, Stimulation and Intervention Operations


Area:

Department of Petroleum Engineering

Credits:

25.0

Contact Hours:

40.0
 
** The tuition pattern below provides details of the types of classes and their duration. This is to be used as a guide only. For more precise information please check your unit outline. **
 

Lecture:

1 x 20 Hours 4 Weekly

Tutorial:

1 x 20 Hours 4 Weekly

Prerequisite(s):

308068 (v.1) Drilling Engineering Fundamentals 603
AND
308069 (v.1) Advanced Drilling Practices 604
 

Syllabus:

Production logging, well diagnosis, sand exclusion and sand management, matrix acidising and acid fracturing, hydraulic fracturing, other chemical treatments, coiled tubing, snubbing, workover planning, intervention operations, intervention well control,workover economics and risk.
 
** To ensure that the most up-to-date information about unit references, texts and outcomes appears, they will be provided in your unit outline prior to commencement. **
 

Field of Education:

10700 Earth Sciences (Narrow Grouping)

HECS Band (if applicable):

2

Extent to which this unit or thesis
utilises online information:

Informational

Result Type:

Grade/Mark

Availability

Availability Information has not been provided by the respective School or Area. Prospective students should contact the School or Area listed above for further information.

 
Click here for a printable version of this page

     Image of People or Curtin's Bentley Campus