301238 (v.2) WASM Mine Backfill 604


 

Area:WASM Mining Engineering Teaching Area
Credits:12.5
Contact Hours:25.0
Individual Study:5 x 5 Hours Weekly
Syllabus:Mining methods using backfill. Selection of backfill. Fill types and materials. Non-geotechnical aspects - manufacture, reticulation and transportation, placement. Cementing agents, binders and other additives. Performance - support, bearing capacity, exposure stability. Stope preparation - barriers and drainage. Laboratory and field testing. Scheduling. Design - physical, analytical and computer methods. Rock-backfill interaction. Soil mechanics. Case studies. Literature study assignment.
 
Unit Outcomes: On completion of this unit students will have - Understood fill properties and specialist testing techniques. Evaluated the different mine fill types and their environmental consequences. Understood their preperation and placement. Identified and studiedmining methods employing fill methods.
Text and references listed above are for your information only and current as of September 30, 2003. Please check with the unit coordinator for up-to-date information.
Unit References: Course materials available. Library-based resources will be used.
Unit Texts: Course materials available. Library-based resources will be used.
 
Unit Assessment Breakdown: Over 50% of this unit is assessed by Assignment and less than 50% by Examination. This is by grade/mark assessment.

 

Copyright and Disclaimer
Current as of: February 2, 2004
CRICOS provider code 00301J